Reliability and security · L2Incident response and postmortems

Incident response and postmortems

Run an incident with one leader, one channel and regular updates, then write a blameless postmortem whose fixes really get done.

L2 SeniorReliability and security20 min read
Fact-checked by AI against cited sources · Human review pendingLast reviewed 21 Oct 2026 · How we check content
Section 1 of 8

What broke

On 5 April 2022 at 07:38 UTC, a script at Atlassian started to delete customer sites. It was meant to remove one old app. By mistake, it was given the IDs of whole sites. It deleted 883 sites, which belonged to 775 customers. 1

The first customer support ticket came at 07:46 UTC. Atlassian started its major incident process at 08:17 and raised the incident to Critical at 08:24. The first status page update went out at 09:03. 1 So far, the response was fast.

Then it got hard. For some customers, the outage lasted up to 14 days. 1 Leaders met every three hours, and a global team worked 24/7. More than 450 support engineers checked restored sites in shifts. 1

The talking part went badly. The script had also deleted customer contact details, so Atlassian could not reach many of the customers who were hurt. 1 Its first broad public message, a tweet, came on 7 April at 00:56 UTC. That was about 41 hours after the script started. 1

In its review, Atlassian wrote that it "should have implemented broader communications much earlier". It also said it should have admitted sooner that it was not sure when sites would be back. Its fixes included 24/7 backups for each communications role. 1

Fixing the system is only half of an incident. The other half is people.

Section 2 of 8

The idea in simple words

An incident is a problem too big for one person working alone. The debugging lesson covers how to find and stop the cause. This lesson covers how the team works together, and how it learns afterwards.

Google's SRE workbook names three goals, the "three Cs". Coordinate the work. Communicate with responders, the company and the outside world. Control the response. 3

The key idea. An incident needs one leader, one place to talk and a steady rhythm of updates. Afterwards, it needs a postmortem that blames no one, and fixes that really get done.

Section 3 of 8

How it works

Running an incident: from the first alert to tracked action items1 · Detectalert orcustomer ticket 2 · Declare + name ICseverity, channel,roles, timeline 3 · Update on a clock30 min to leaders,even "no news yet" 4 · Mitigateops lead changesthe system, IC leads 5 · Resolveimpact has ended,final update sent 6 · Postmortemblameless, manycontributing factors 7 · Actions trackedowner, ticket,priority, due date SeniorPath
  1. Something looks wrong. An alert fires, or a customer opens a support ticket. You do not know yet how big it is.
  2. Declare an incident now, not later. Pick a severity, open one channel, and name one incident commander. Someone starts writing the timeline.
  3. Updates go out on a fixed clock. At PagerDuty, the internal liaison updates the executive team roughly every 30 minutes. Each update says what you know, what you do not know yet, and when the next update comes.
  4. The operations lead and the experts work to stop the harm. Only they change the system. The incident commander keeps the big picture and makes the decisions.
  5. The incident ends when the business impact has ended. The incident commander says so clearly, and the last update tells everyone it is over.
  6. Within days, the team meets and writes a blameless postmortem. It looks for the many factors that came together, not for one person to blame.
  7. Every follow-up action becomes a ticket with one owner, a priority and a due date. Someone checks that they close, so the lesson is not lost.
Step 1 of 7

1. Declare early

Google's advice is: "Declare incidents early and often." In its experience, managed incidents are resolved faster. 3 The SRE book gives three tests. If any one is true, it is an incident: 2

  • You need a second team to help fix it.
  • Customers can see the problem.
  • It is still not solved after an hour of focused work.

2. Pick a severity level

A severity level tells everyone how bad it is and how to respond. PagerDuty uses five levels. SEV-1 and SEV-2 are major incidents. SEV-5 is a cosmetic bug that becomes a ticket. 7 Atlassian pages people for severity 1 and 2. Severity 3 goes to the team during work hours. 11

When you are not sure, PagerDuty says to treat it as the higher level. Do not argue about the level during the incident; review it in the postmortem. 7

3. Give out roles, with one leader

Google's model has four roles: command, operations, communication and planning. 2 PagerDuty adds a scribe, who writes the timeline as it happens. 8 The debugging lesson lists what each role does. Two rules matter most:

  • The incident commander (IC) does not fix things. PagerDuty says the IC is "NOT a resolver". The IC is "the single source of truth" and gives out the work. 8
  • Only operations changes the system. In Google's model, nobody else touches production during the incident. 2

Atlassian says it is "very important to be clear who's in charge". 11

4. One channel, one timeline

Atlassian opens one chat channel per incident, named after its ticket, for example HOT-1234. People write their observations, changes and decisions there as they happen. Atlassian says: "It's okay if it looks like people are talking to themselves!" 11

Google calls a living incident document the IC's "most important responsibility". It can be messy, but it must be useful. 2 This record becomes your postmortem timeline.

5. Update on a clock, even with no news

At PagerDuty, the internal liaison sends a short update to the executive team "roughly every 30mins". 9 That rhythm is for internal leaders. PagerDuty gives no fixed rhythm for customer updates. 9 Our advice: pick a rhythm for each audience, put it in every update, and keep it even when nothing has changed.

Atlassian's internal template is simple: 11

  1. One or two sentences on the current state and impact.
  2. "Current Status": 2–4 bullet points.
  3. "Next Steps": 2–4 bullet points.
  4. When and where the next update will come.

When you do not know something, say so. Atlassian says it is "far better to say 'the root cause is currently unknown'" than to leave it out. Without a shared source of truth, people jump to their own conclusions. 11

For customers, one or two sentences are usually enough. They want to know if it is fixed, and if not, when. 11 At PagerDuty, a public post is the IC's choice, with the rule: "If in doubt, post it out." 9

A sample: "Checkout fails for about 20% of users since 14:05. We rolled back the 14:00 deploy; errors are falling. Cause unknown. Next update 14:50 in #inc-2231."

6. Hand over, and rest

Google's SRE book says stress hormones can "impair cognitive functions". 6 Atlassian asks incident managers to watch how long people have been awake and to plan who takes over. 11 In a case in Google's workbook, PagerDuty rotated its responders and its IC every four hours. That gave people rest and brought new ideas. 3

Make handovers explicit. The outgoing IC says, "You're now the incident commander, okay?" and waits for a firm yes before leaving. 2

7. End it clearly

Atlassian says an incident is resolved "when the current or imminent business impact has ended". 11 At PagerDuty, the IC announces the end and moves other talk to Slack. 9 Atlassian's final update gives the impact and duration. Customers hear that service is back and a postmortem will follow. 11

8. Write a blameless postmortem

Google writes a postmortem for user-visible downtime above a threshold, any data loss, a rollback or other fix by the on-call engineer, a long resolution time, or a monitoring failure. 4 At PagerDuty, the postmortem owner schedules the meeting within 3 calendar days for a Sev-1 and 5 business days for a Sev-2. 10

Google's good example includes the impact, causes, timeline, "where we got lucky", and action items. 5

Blameless means you look for the causes without blaming any person or team. 4 Ask what went wrong, not who caused it. 5

Contributing factors. PagerDuty says: "There is no single root cause of major failure in complex systems." A person's action should never be called a root cause. 10 Atlassian still looks for root causes, using the "Five Whys". It separates the proximate cause, which led directly to the incident, from the root cause. The root cause is the best place to change so that the whole class of incident stops. 12

Action items. Each one needs an owner, a tracking number, a priority and an end state you can check. 5 PagerDuty asks you to start each one with a verb and keep it narrow. 10 Atlassian's "priority actions" must be done in 4 or 8 weeks, and managers approve each postmortem. 12 Google quotes: "a postmortem without subsequent action is indistinguishable from no postmortem." 5

Share it. Google says "an unreviewed postmortem might as well never have existed". It shares good ones widely, for example as a "postmortem of the month". 4

9. Keep on-call healthy

Google's SRE book sets limits. Allow at most two incidents per 12-hour shift, because one incident takes about 6 hours of work. A rotation on one site needs at least eight engineers, or six per site on two sites. 6 "All paging alerts should also be actionable." 6 The alerting lesson goes deeper.

10. Practise before it is real

Google's DiRT tests create "a controlled emergency". PagerDuty's "Failure Friday" injects failures to learn how systems break. 3 In a Wheel of Misfortune, engineers act out an old postmortem, each playing a role. 4 The chaos engineering lesson covers such a game day.

Section 4 of 8

Trade-offs

ChoiceBenefitCostUse it when
Declare earlyYes Help and roles arrive fast.Some false alarms.Any of the three tests is true, or you are unsure.
One IC, few hands on the systemYes Every change is known and agreed.The IC can become a bottleneck in a huge incident.Almost always. Split into sub-teams if it grows.
Everyone jumps inMany ideas at once.No Changes clash, and nobody knows what changed.Never as the default. Experts join when the IC asks.
Contributing factorsA fuller picture.More actions to track.Large or repeated incidents.
One root cause (Five Whys)Simple and focused.Can miss other factors.Small, clear incidents.
Section 5 of 8

At work: how a senior uses this

  • Say "I am declaring an incident" out loud. Then ask: "Who is IC? Who talks to customers? Who writes notes?"
  • If you are the IC, do not open a terminal. Ask each expert, "What do you see? What do you need?"
  • Put the next update time in every update, and keep it, even if the update is "no change".
  • In long incidents, ask who needs to sleep. Hand over with a written summary and a clear "you are IC now".
  • In the postmortem, replace "Ravi ran the wrong command" with "the tool allowed a bulk delete with no check".
  • Each quarter, count pages per shift and remove alerts that needed no action.
Section 6 of 8

With AI

What to ask the agent

"Here is the export of #inc-2231. Build a UTC timeline of each observation, decision, change and update. Mark any line where the time is unclear."

"Draft our next internal update: state and impact, current status, next steps, next update time. Use only facts from the channel. Write 'unknown' where we do not know."

"Draft a blameless postmortem from this timeline. Use roles, not names. List contributing factors, and propose action items that each start with a verb. Leave owners and dates empty."

What to check yourself

  • Every time and fact. Compare the timeline with your logs. A summary can merge or drop events.
  • Customer updates. Check numbers, scope and promises before they go out.
  • Blame. Remove any wording that points at a person, even softly, such as "failed to notice".
  • Decisions stay with people. The IC picks the severity and fixes; the team picks owners and dates.
Section 7 of 8

Check yourself

1. A small part of checkout fails for some users. Nobody is sure yet how big the problem is. What should you do?

Show answer

Declare an incident now. You can lower the severity later. Google advises declaring incidents early, because managed incidents are resolved faster. PagerDuty says to pick the higher severity when unsure.

2. During a big incident, what should the incident commander mostly do?

Show answer

Hold the big picture, give out the work and make decisions, while others make the changes. PagerDuty says the incident commander is not a resolver and gives out the repair work. In Google's model, only the operations team changes the system.

3. It is 30 minutes after your last internal update and you have learned nothing new. What do you send?

Show answer

"We are still investigating. The cause is not known yet. Next update at 15:30." Atlassian's guide says to name the unknowns and to say when and where the next update will come. Without updates, people jump to their own conclusions.

4. Which postmortem action item is written best?

Show answer

"Add a check that blocks a bulk delete of more than 10 sites. Owner: Priya. Due: 15 May. Ticket OPS-412." PagerDuty asks for a narrow item that starts with a verb. Google asks for an owner, a tracking ticket, a priority and an end state you can check.

5. Your on-call engineer was paged nine times last night, mostly for alerts that needed no action. What is the senior response?

Show answer

Fix or delete the noisy alerts, because every page should need a human to act. Google's SRE book says all paging alerts should be actionable, and noisy alerts should move toward one alert per incident.

Your progress is saved only in this browser. Export it to keep it safe.

Was this clear?
Report a mistake (opens GitHub in a new tab)
Section 8 of 8

Go deeper

Show 12 sources and related lessons
  1. Atlassian, “Post-Incident Review on the Atlassian April 2022 outage” (official review) (opens in a new tab)
    The full timeline of the outage, and an honest section on what went wrong in talking to customers.
  2. Andrew Stribblehill, “Managing Incidents”, Google, Site Reliability Engineering, chapter 14 (opens in a new tab)
    Incident roles, the living incident document, clear handoffs, and when to declare an incident.
  3. Google, “Incident Response”, The Site Reliability Workbook, chapter 9 (opens in a new tab)
    The three Cs, case studies from Google and PagerDuty, rotating responders, and drills.
  4. John Lunney and Sue Lueder, “Postmortem Culture: Learning from Failure”, Google, Site Reliability Engineering, chapter 15 (opens in a new tab)
    When to write a postmortem, what blameless means, and how Google reviews and shares them.
  5. Google, “Postmortem Culture: Learning from Failure”, The Site Reliability Workbook, chapter 10 (opens in a new tab)
    A bad and a good example postmortem, side by side, and how to make action items close.
  6. Andrea Spadaccini, “Being On-Call”, Google, Site Reliability Engineering, chapter 11 (opens in a new tab)
    Limits on incidents per shift, team size for a rotation, and why every page must be actionable.
  7. PagerDuty Incident Response documentation: Severity Levels (opens in a new tab)
    Five severity levels with examples, and the rule to pick the higher level when unsure.
  8. PagerDuty Incident Response documentation: Different Roles (opens in a new tab)
    What the incident commander, deputy, scribe, experts and liaisons each do.
  9. PagerDuty Incident Response documentation: During an Incident (opens in a new tab)
    Step-by-step duties for the incident commander, from the first page to ending the call.
  10. PagerDuty Postmortem documentation: Step by Step (opens in a new tab)
    Who owns the postmortem, when to meet, contributing factors, and how to word action items.
  11. Atlassian Incident Management Handbook: How we respond to an incident (opens in a new tab)
    Atlassian's steps from detection to resolution, with templates for internal and external updates.
  12. Atlassian Incident Management Handbook: Postmortems (opens in a new tab)
    Postmortem owners and approvers, "priority actions" with a 4 or 8 week deadline, and proximate against root causes.

Real incident: Atlassian, 5 Apr 2022: Atlassian outage: a cleanup script deleted 883 sites

Related: Debugging production · Alerting and on-call · Observability, SLOs and error budgets · Chaos engineering and game days · Clear technical writing (coming soon)

Term

See full entry

Jump to a section

  1. 1What broke
  2. 2The idea in simple words
  3. 3How it works
  4. 4Trade-offs
  5. 5At work
  6. 6With AI
  7. 7Check yourself
  8. 8Go deeper